Haberler

For the Shumat energy project

For the Shumat energy project, 108 tons of Klos transformer were suspended with a jack and hydorolic system at our own facilities and the pool was dismantled. the length of the vehicle was reduced from 33 mt to 26 mt by taking the transformer on the axles.